Bridge Maintenance (1)
| Not Complete |
| Complete |
Project Design (55)
Construction Projects (56)
Hagg Lake Project (57)
| Not Complete |
| Complete |
Asphalt Apron Maintenance (58)
| Not Complete |
| Complete |
Chip Seal (3)
| Not Complete |
| Complete |
Crack Seal (4)
| Not Complete |
| Complete |
Asphalt Paving (5)
| Not Complete |
| Complete |
Pathway Maintenance (6)
| Not Complete |
| Complete |
Asphalt Repairs (7)
| Not Complete |
| Complete |
Shoulder Maintenance (13)
| Not Complete |
| Complete |
Surface Stabilization (14)
| Not Complete |
| Complete |
Sweeping (15)
| Not Complete |
| Complete |
Gravel Road Maintenance (16)
| Not Complete |
| Complete |
Thin Lift Asphalt Overlay (61)
| Not Complete |
| Complete |
Plant Establishment (25)
| Not Complete |
| Complete |
Brush Cut (18)
| Not Complete |
| Complete |
Riparian Management Area Maintenance (20)
| Not Complete |
| Complete |
Targeted Vegetation Treatment (59)
| Not Complete |
| Complete |
Vegetation Chemical Controls (21)
| Not Complete |
| Complete |
Irrigation Maintenance (23)
| Not Complete |
| Complete |
Landscape Mowing (24)
| Not Complete |
| Complete |
Shoulder Mowing (26)
| Not Complete |
| Complete |
Community Service - Landscape Maintenance (60)
| Not Complete |
| Complete |
Community Service - Pathway Maintenance (66)
| Not Complete |
| Complete |
Community Service - Traffic Seperator Maintenance (70)
| Not Complete |
| Complete |
Erosion Repair (29)
| Not Complete |
| Complete |
Catch Basin Cleaning (30)
| Not Complete |
| Complete |
Beaver Control Device Maintenance (62)
| Not Complete |
| Complete |
Culvert Replacement (31)
| Not Complete |
| Complete |
Ditch Maintenance (32)
| Not Complete |
| Complete |
Shoulder Pulling (35)
| Not Complete |
| Complete |
Tile Flushing (36)
| Not Complete |
| Complete |
Under Guardrail Cleaning (37)
| Not Complete |
| Complete |
Raised Pavement Marker Maintenance (69)
| Not Complete |
| Complete |
Railroad Stencils (39)
| Not Complete |
| Complete |
School Crossing Stencils (40)
| Not Complete |
| Complete |
Speed Cushion Thermo (63)
| Not Complete |
| Complete |
Striping (41)
Traffic Signal Maintenane (44)
Contracted Bridge Deck Maintenance (68)
Contracted Overlay (Road Fund) (47)
Contracted Overlay (URMD) (48)
Contracted Slurry Seal (URMD) (49)
Contracted Widening and Overlay (Road Fund) (52)
Contracted Full Depth Reclamation (FDR) (53)
Contracted Raised Pavement Markers (65)
Contracted Asphalt Repairs (8)
Contracted Longitudinal Striping (50)
Contracted Thermoplastic Stencils (42)
Contracted Water Quality System Maintenance (28)
Contracted Landscape Maintenance (64)
Contracted Surface Stabilization (67)
Contracted Shoulder Spray (22)
Contracted Flat Work (72)
Contracted Pannel Replacement (73)
Contracted Culvert Replacement (71)
Contracted Guardrail Upgrades (75)
|