| ODOT CCTV (41)
Active and Complete Spot Improvement (30) 
Active and Complete Road Project (31)
|   | Complete |  
|   | Construction |  
|   | Design |  
|   | Committed |  
System of Countywide Interest (39)
|   | Complete |  
|   | Construction |  
|   | Design |  
|   | Committed |  
Walkways (34)
|   | Eligible Arterial/Principal Arterial |  
|   | Eligible Collector |  
Sidewalk Inventory (33)
|   | No Walkway |  
|   | Walkway |  
RLIS Sidewalks Beta (40)
|   | Existing Both Sides |  
|   | Existing One Side |  
|   | Shoulder Suitable Both Sides |  
|   | Shoulder Suitable One Side |  
|   | None or No Facility |  
Bike Lane Inventory (32)
|   | Existing Both Sides |  
|   | Existing Left Side |  
|   | Existing Right Side |  
|   | No Facility Either Side |  
Safety Priority Index System (SPIS) 2014-2016 (12)
Light Rail Station (13)
Light Rail Transit (14)
Railroad (15)
Road Fund Lighting (16)
Service District for Lighting (SDL) (17)
Traffic Signals (18)
Tri Met Bus Stops (19)
Tri Met Bus Routes (20)
County & ODOT Roads (24)
Other Jurisdiction Roads (25)
|   | Existing Both Sides |  
|   | Existing One Side |  
|   | Shoulder Suitable Both Sides |  
|   | Shoulder Suitable One Side |  
|   | None or No Facility |  |